Front panel in 2024.
"A" gate swung open to reveal the SLT boards removed for cleaning.
CPU frame on the move in 2011.
CPU frame on the move in 2011.
CPU frame on the move in 2024.
Power frame on the move in 2024.
Sketch of the 7201-02 from an IBM manual.
7201-02 arrangement of frames. I don't have (or need) the battery frame.
The three 7201-02 frames in storage, plus doors on a pallet.
My 7201-02 before decommissioning, showing the E Gate
Internals of the DAT frame